Introducing The Sweep: OX’s New Live Security Research Series
Register Now
Breaking: The 2026 Vulnpocalypse Hits PHP: Four Critical RCEs, but How Dangerous Are They?
Read the Report
Are you exposed? Connect your apps in minutes.
Scan your apps free

Wattlas — US Data Center Intelligence

Latest version: v2.0.1

Overview

Last scanned
28 Nov 2026
Published
28 Nov 2026
MCP server Transport: Streamable HTTP Publisher: WattlasIO
0 Stars
0 Forks
2 Versions

Scan summary

Wattlas — US Data Center Intelligence was last scanned on 28 Nov 2026 at version 2.0.1. Risk score 0 of 100. No malicious behavior was detected.

  • Releases: 2 versions, all published on 28 Nov 2026.
  • Findings: No rules fired in version 2.0.1.
  • MCP server: Runs over Streamable HTTP; the probe connected over SSE. It does not require authentication. It uses MCP protocol version 2025-06-18. Exposes 10 tools.

Versions

2 versions published
Versions and the rules that fired in each
VersionPublishedStatus
2.0.1 LATEST 28 Nov 2026 No rules fired
2.0.0 28 Nov 2026 No rules fired

No rules fired in 2.0.1

Findings

Findings for v2.0.1. The score is a capped sum of the weights of the rules that fired — not CVSS, not exploitability, and not a probability. It is not comparable across packages with different scan coverage.

The score describes 2.0.1; other versions have their own rules, not their own score.

README

The publisher’s own README, as collected from the registry.


  • Remote Endpoint: https://app.wattlas.io/mcp
  • Transport: Streamable HTTP (streamable-http) — no local binary, Docker container, or npm install required
  • Authentication: Optional OAuth 2.1 (PKCE S256, CIMD + Dynamic Client Registration). 4 public tools + 3 full sample dossiers work without signing in.
  • Registry ID: io.wattlas/wattlas

This repository contains the public MCP manifest and setup documentation. The hosted read-only MCP server runs at https://app.wattlas.io/mcp.


Quick Setup

Claude.ai & Claude Desktop
  1. Open Settings → Connectors → Add custom connector (or install Wattlas from the Claude Connectors Directory).
  2. Paste https://app.wattlas.io/mcp.
  3. Public tools work immediately; sign in with Google or email when prompted for full campus dossiers and filings.
ChatGPT
  1. Add Wattlas from the ChatGPT Apps Directory (or enable Developer Mode and add https://app.wattlas.io/mcp).
  2. Public tools work without sign-in; connect your Wattlas account for full dossiers and filing search.
Claude Code
claude mcp add --transport http wattlas https://app.wattlas.io/mcp
Cursor (.cursor/mcp.json)
{
  "mcpServers": {
    "wattlas": {
      "url": "https://app.wattlas.io/mcp"
    }
  }
}
VS Code & GitHub Copilot (.vscode/mcp.json)
{
  "servers": {
    "wattlas": {
      "type": "http",
      "url": "https://app.wattlas.io/mcp"
    }
  }
}
Headless & Scripted Agents (Wattlas Pro API Key)

Create an API key at app.wattlas.io/account and pass it as a Bearer header:

{
  "mcpServers": {
    "wattlas": {
      "type": "http",
      "url": "https://app.wattlas.io/mcp",
      "headers": {
        "Authorization": "Bearer wlt_YOUR_PRO_API_KEY"
      }
    }
  }
}

Tools (10 Read-Only Tools)

Public — No Sign-In Required
Tool What it returns
get_pipeline_summary US Pipeline, Operating, and Unconfirmed counts + disclosed vs. estimated MW by state or permit stage
check_moratoriums Active, pending, extended, and expired county, city, and township data center moratoriums with citations
get_metro_market 34 US metro power-market profiles: pipeline MW, ISO region, industrial power rates, land clearing, moratorium counts
search_jobs Open US data center construction, engineering, and operations roles by state, city, or employer
get_campus_dossier (samples) 3 full unlocked sample dossiers without sign-in: c_1c0224764f, c_5cda962849, c_2b4dda183c
Wattlas Account & Pro ($299/mo or $2,400/yr)
Tool What it returns
search_campuses Search 10,500+ campuses across Pipeline, Operating, and Unconfirmed (Free returns public fields; Pro adds deep filters & exact coordinates)
get_campus_dossier Full modular campus dossiers: core, grid, water_energy, diesel_epa, parcel_site, satellite, opposition, filings, jobs
list_filings Cleared primary-source .gov and civic filings with direct official URLs
search_owners Owners, developers, operators, and tenants across their US campus portfolio
get_campus_opposition Local moratoriums, petitions, contested lawsuits, and community signals
get_site_rankings Rank campuses by backup diesel MW, disclosed water use, water stress, earthwork ahead of permit stage, pipeline MW, or grid rates

Example Prompts

  • "Summarize Virginia's data center pipeline and separate disclosed from estimated megawatts."
  • "Which active or pending data center moratoriums does Wattlas track in Georgia?"
  • "Compare Northern Virginia and Dallas–Fort Worth by pipeline size and industrial power price."
  • "Open the full Wattlas sample dossier for Stafford Technology Campus (c_5cda962849)."
  • "List recent cleared Ohio data center government filings with direct official links."

Data Policy & Support

  • Read-only: Wattlas MCP tools only query cleared public-record data and never mutate external systems.
  • No prompt logging: Aggregate tool-call metrics only; prompt text is never logged.
  • No personal data: Organizations and public filings only.
  • Support: hello@wattlas.io · wattlas.io/removal/

Live check

What the probe observed on connect. Fields the probe did not learn are not shown — never guessed.

Reachable
YES
Transport
SSE
Authentication
NONE — OPEN
MCP protocol
2025-06-18
Server
Wattlas 2.0.0
Tools advertised
10

OX Radar and Response Center

Find threats in your stack.

OX Radar can check high-priority threats, like critical package CVEs, against your context.

Each incident is marked Detected or Not Detected with a remediation plan and proof all tracked in the Response Center.

Capabilities

10 tools advertised

This server advertises the tools below. A tool list is an inventory of what the server can do — it is not a finding, and it is not part of the score.

get_pipeline_summary

Summarize confirmed US data center pipeline, operating, and unconfirmed campus counts and disclosed vs. estimated megawatt coverage by state or stage.

Params state stage group

check_moratoriums

Check active, pending, extended, and expired US city, county, and township data center moratoriums and zoning bans with status, date, and source links.

Params state county city status limit

get_metro_market

Inspect US data center metro markets: pipeline and construction campus counts, disclosed MW, ISO region, industrial electricity rates, Sentinel-2 clearing activity, and local moratorium counts.

Params metro state iso limit

search_jobs

Search open US data center construction, engineering, commissioning, and operations roles by state, city, employer, or keyword.

Params state city employer query limit

search_campuses

Search US data center campuses across Pipeline, Operating, and Unconfirmed groups by name, location, stage, owner, ISO, megawatts, moratorium, or water risk. Free accounts return public fields; Wattlas Pro unlocks all campuses and deep filters.

Params query state county city stage group owner iso min_mw has_moratorium has_clearing water_risk limit

get_campus_dossier

Retrieve a detailed campus dossier by campus ID (c_...) or public slug, including modular sections for grid/utility, water/energy use, backup diesel/EPA, parcel/site facts, satellite aerial vision, opposition, jobs, and cleared filings. Three public sample campuses work without sign-in; all other campuses require Wattlas Pro.

Params campus_id sections

list_filings

List cleared primary-source government and civic data center filings by campus ID, state, county, stage, or date range with direct official URLs (requires Wattlas Pro).

Params campus_id state county stage start_date end_date limit

search_owners

Look up data center owners, developers, operators, or tenants and inspect their US campus portfolio, total disclosed MW, states, and corporate links (requires Wattlas Pro).

Params query role state limit

get_campus_opposition

Retrieve local data center opposition signals including moratorium ordinances, petitions, contested lawsuits, and community threads by campus ID, state, or county (requires Wattlas Pro).

Params campus_id state county kind limit

get_site_rankings

Rank US data center campuses by permitted backup diesel MW, disclosed water use, WRI water stress, Sentinel-2 earthwork ahead of permit stage, pipeline MW, or rising industrial power rates (requires Wattlas Pro).

Params metric state group limit

Where it’s listed

The probe returned only these fields for this server — auth requirement, protocol and tool list weren’t observed, so they’re not shown (never guessed).

  • MCP Registry io.wattlas/wattlas

References

The publisher’s own links, as the registry reports them. These are not sources for the assessment on this page.

Powered by Read the latest findings

Scan your whole stack

Group 1261154050 1
Group 1261154050
 

From OX Research Newsroom

PolinRider Returns
Research

PolinRider Returns: Hijacked npm Packages Use Ethereum Blockchain to Conceal Malware Infrastructure

Copy of Template Design OX Blog (2)
Research

NGINX2Root: Five Critical NGINX Flaws Expose Web Servers to Remote Code Execution

Ethersphere Hijacked With Crypto Stealing Malware (1)
npm

Ethersphere Hijacked With Crypto Stealing Malware Via Github & npm

Frame 2085668439 (1)
Group 1261154229