Scan your whole stack
Latest version: v2.0.1
Wattlas — US Data Center Intelligence was last scanned on 28 Nov 2026 at version 2.0.1. Risk score 0 of 100. No malicious behavior was detected.
| Version | Published | Status |
|---|---|---|
| 2.0.1 LATEST | 28 Nov 2026 | No rules fired |
| 2.0.0 | 28 Nov 2026 | No rules fired |
Findings for v2.0.1. The score is a capped sum of the weights of the rules that fired — not CVSS, not exploitability, and not a probability. It is not comparable across packages with different scan coverage.
The score describes 2.0.1; other versions have their own rules, not their own score.
The publisher’s own README, as collected from the registry.
https://app.wattlas.io/mcpstreamable-http) — no local binary, Docker container, or npm install requiredio.wattlas/wattlasThis repository contains the public MCP manifest and setup documentation. The hosted read-only MCP server runs at
https://app.wattlas.io/mcp.
https://app.wattlas.io/mcp.https://app.wattlas.io/mcp).claude mcp add --transport http wattlas https://app.wattlas.io/mcp
.cursor/mcp.json){
"mcpServers": {
"wattlas": {
"url": "https://app.wattlas.io/mcp"
}
}
}
.vscode/mcp.json){
"servers": {
"wattlas": {
"type": "http",
"url": "https://app.wattlas.io/mcp"
}
}
}
Create an API key at app.wattlas.io/account and pass it as a Bearer header:
{
"mcpServers": {
"wattlas": {
"type": "http",
"url": "https://app.wattlas.io/mcp",
"headers": {
"Authorization": "Bearer wlt_YOUR_PRO_API_KEY"
}
}
}
}
| Tool | What it returns |
|---|---|
get_pipeline_summary |
US Pipeline, Operating, and Unconfirmed counts + disclosed vs. estimated MW by state or permit stage |
check_moratoriums |
Active, pending, extended, and expired county, city, and township data center moratoriums with citations |
get_metro_market |
34 US metro power-market profiles: pipeline MW, ISO region, industrial power rates, land clearing, moratorium counts |
search_jobs |
Open US data center construction, engineering, and operations roles by state, city, or employer |
get_campus_dossier (samples) |
3 full unlocked sample dossiers without sign-in: c_1c0224764f, c_5cda962849, c_2b4dda183c |
$299/mo or $2,400/yr)| Tool | What it returns |
|---|---|
search_campuses |
Search 10,500+ campuses across Pipeline, Operating, and Unconfirmed (Free returns public fields; Pro adds deep filters & exact coordinates) |
get_campus_dossier |
Full modular campus dossiers: core, grid, water_energy, diesel_epa, parcel_site, satellite, opposition, filings, jobs |
list_filings |
Cleared primary-source .gov and civic filings with direct official URLs |
search_owners |
Owners, developers, operators, and tenants across their US campus portfolio |
get_campus_opposition |
Local moratoriums, petitions, contested lawsuits, and community signals |
get_site_rankings |
Rank campuses by backup diesel MW, disclosed water use, water stress, earthwork ahead of permit stage, pipeline MW, or grid rates |
c_5cda962849)."What the probe observed on connect. Fields the probe did not learn are not shown — never guessed.
Find threats in your stack.
OX Radar can check high-priority threats, like critical package CVEs, against your context.
Each incident is marked Detected or Not Detected with a remediation plan and proof all tracked in the Response Center.
This server advertises the tools below. A tool list is an inventory of what the server can do — it is not a finding, and it is not part of the score.
Summarize confirmed US data center pipeline, operating, and unconfirmed campus counts and disclosed vs. estimated megawatt coverage by state or stage.
Check active, pending, extended, and expired US city, county, and township data center moratoriums and zoning bans with status, date, and source links.
Inspect US data center metro markets: pipeline and construction campus counts, disclosed MW, ISO region, industrial electricity rates, Sentinel-2 clearing activity, and local moratorium counts.
Search open US data center construction, engineering, commissioning, and operations roles by state, city, employer, or keyword.
Search US data center campuses across Pipeline, Operating, and Unconfirmed groups by name, location, stage, owner, ISO, megawatts, moratorium, or water risk. Free accounts return public fields; Wattlas Pro unlocks all campuses and deep filters.
Retrieve a detailed campus dossier by campus ID (c_...) or public slug, including modular sections for grid/utility, water/energy use, backup diesel/EPA, parcel/site facts, satellite aerial vision, opposition, jobs, and cleared filings. Three public sample campuses work without sign-in; all other campuses require Wattlas Pro.
List cleared primary-source government and civic data center filings by campus ID, state, county, stage, or date range with direct official URLs (requires Wattlas Pro).
Look up data center owners, developers, operators, or tenants and inspect their US campus portfolio, total disclosed MW, states, and corporate links (requires Wattlas Pro).
Retrieve local data center opposition signals including moratorium ordinances, petitions, contested lawsuits, and community threads by campus ID, state, or county (requires Wattlas Pro).
Rank US data center campuses by permitted backup diesel MW, disclosed water use, WRI water stress, Sentinel-2 earthwork ahead of permit stage, pipeline MW, or rising industrial power rates (requires Wattlas Pro).
The probe returned only these fields for this server — auth requirement, protocol and tool list weren’t observed, so they’re not shown (never guessed).
The publisher’s own links, as the registry reports them. These are not sources for the assessment on this page.