Scan your whole stack
Are you using @mrfentmen/change-order-audit-mcp?
Find out what’s in your code.
Scan your apps free in minutes (opens in a new tab)Latest version: v1.0.0
@mrfentmen/change-order-audit-mcp was last scanned on 27 Nov 2026 at version 1.0.0. Risk score 0 of 100. No malicious behavior was detected.
| Version | Published | Status |
|---|---|---|
| 1.0.0 LATEST | 27 Nov 2026 | No rules fired |
| 0.0.0-stage | 27 Nov 2026 | Not shown |
Findings for v1.0.0. The score is a capped sum of the weights of the rules that fired — not CVSS, not exploitability, and not a probability. It is not comparable across packages with different scan coverage.
The score describes 1.0.0; other versions have their own rules, not their own score.
The publisher’s own README, as collected from the registry.
Real local JSON analysis of change order audit in the Build & Factory lane. 25 MCP tools, no paywall.
npm install -g @mrfentmen/change-order-audit-mcp
{
"mcpServers": {
"change-order-audit-mcp": {
"command": "npx",
"args": ["-y", "@mrfentmen/change-order-audit-mcp"]
}
}
}
Pass an array, an object with an items array, or a JSON file path. Every item needs a name and category. Cost, quantity, dates, condition, tags and notes are optional.
{
"items": [
{
"id": "build_change_order_audit-build-1",
"name": "build primary",
"category": "build",
"tags": [
"build-factory",
"change",
"order"
],
"cost": 20,
"quantity": 1,
"acquired": "2026-01-15",
"lastUsed": "2026-10-15",
"expires": "2026-12-15",
"condition": "good",
"notes": "Baseline entry; replace with your own data."
},
{
"id": "build_change_order_audit-audit-2",
"name": "audit primary",
"category": "audit",
"tags": [
"build-factory",
"change",
"order"
],
"cost": 35,
"quantity": 2,
"acquired": "2026-01-15",
"lastUsed": "2026-10-15",
"expires": "2026-12-29",
"condition": "good",
"notes": "Baseline entry; replace with your own data."
}
]
}
| Tool | What it does |
|---|---|
inventory_build_change_order_audit |
Count items by category and show spend, quantity, freshness and the primary metric. |
score_build_change_order_audit_readiness |
Score readiness from 0 to 100 with coverage, condition, data and metric components. |
audit_build_change_order_audit_coverage |
Show category coverage ratios and unknown categories. |
flag_build_change_order_audit_gaps |
List missing categories, expired items, expiring items and dependency gaps. |
rank_build_change_order_audit_risks |
Rank coverage, expiry, budget, duplicate, condition and data risks. |
check_build_change_order_audit_constraints |
Check item cap, budget, coverage, expiry and metric targets. |
compare_build_change_order_audit_baseline |
Compare category counts with the configured baseline. |
estimate_build_change_order_audit_service_gap |
Calculate the primary metric for every item with mean and pass count. |
find_build_change_order_audit_quick_wins |
Find low-effort fixes from small gaps, missing data, expiry and duplicates. |
map_build_change_order_audit_dependencies |
Map dependency groups and show which ones are missing. |
test_build_change_order_audit_edge_cases |
Test empty, single-item, duplicate-id, zero-cost, expiry and unknown-category cases. |
summarize_build_change_order_audit_findings |
Summarize counts, top gaps, top risks and data issues. |
prioritize_build_change_order_audit_fixes |
Rank fixes by impact divided by effort. |
validate_build_change_order_audit_inputs |
Validate arbitrary JSON and report schema errors and warnings. |
detect_build_change_order_audit_duplicates |
Group items with the same category and normalized name. |
measure_build_change_order_audit_variance |
Measure metric spread, category variance and tag diversity. |
benchmark_build_change_order_audit_options |
Benchmark lean, balanced and full sizes against readiness and data targets. |
explain_build_change_order_audit_tradeoffs |
Explain size, cost, freshness and data-quality tradeoffs. |
draft_build_change_order_audit_checklist |
Draft a checklist from gaps, high risks, missing data and budget. |
export_build_change_order_audit_audit |
Export the full audit with metrics, gaps, risks, constraints and next steps. |
track_build_change_order_audit_changes |
Compare two snapshots by item id and list added, removed and changed items. |
review_build_change_order_audit_history |
Review dated snapshots and show readiness, cost and metric trends. |
score_build_change_order_audit_confidence |
Score trust from data completeness, item count and field coverage. |
recommend_build_change_order_audit_next_steps |
Recommend the next five actions with quick wins. |
open_build_change_order_audit_questions |
List open questions that block a better audit. |
YYYY-MM-DD.Find threats in your stack.
OX Radar can check high-priority threats, like critical package CVEs, against your context.
Each incident is marked Detected or Not Detected with a remediation plan and proof all tracked in the Response Center.
The probe returned only these fields for this server — auth requirement, protocol and tool list weren’t observed, so they’re not shown (never guessed).
The publisher’s own links, as the registry reports them. These are not sources for the assessment on this page.