change order checklist Checklist
Real local JSON analysis of change order checklist in the Build & Factory lane. 25 MCP tools, no paywall.
Install
npm install -g @mrfentmen/change-order-checklist-mcp
Use with an MCP client
{
"mcpServers": {
"change-order-checklist-mcp": {
"command": "npx",
"args": ["-y", "@mrfentmen/change-order-checklist-mcp"]
}
}
}
Input
Pass an array, an object with an items array, or a JSON file path. Every item needs a name and category. Cost, quantity, dates, condition, tags and notes are optional.
{
"items": [
{
"id": "build_change_order_checklist-build-1",
"name": "build primary",
"category": "build",
"tags": [
"build-factory",
"change",
"order"
],
"cost": 20,
"quantity": 1,
"acquired": "2026-01-15",
"lastUsed": "2026-10-15",
"expires": "2026-12-15",
"condition": "good",
"notes": "Baseline entry; replace with your own data."
},
{
"id": "build_change_order_checklist-checklist-2",
"name": "checklist primary",
"category": "checklist",
"tags": [
"build-factory",
"change",
"order"
],
"cost": 35,
"quantity": 2,
"acquired": "2026-01-15",
"lastUsed": "2026-10-15",
"expires": "2026-12-29",
"condition": "good",
"notes": "Baseline entry; replace with your own data."
}
]
}
Tools (25)
| Tool |
What it does |
inventory_build_change_order_checklist |
Count items by category and show spend, quantity, freshness and the primary metric. |
score_build_change_order_checklist_readiness |
Score readiness from 0 to 100 with coverage, condition, data and metric components. |
audit_build_change_order_checklist_coverage |
Show category coverage ratios and unknown categories. |
flag_build_change_order_checklist_gaps |
List missing categories, expired items, expiring items and dependency gaps. |
rank_build_change_order_checklist_risks |
Rank coverage, expiry, budget, duplicate, condition and data risks. |
check_build_change_order_checklist_constraints |
Check item cap, budget, coverage, expiry and metric targets. |
compare_build_change_order_checklist_baseline |
Compare category counts with the configured baseline. |
estimate_build_change_order_checklist_service_gap |
Calculate the primary metric for every item with mean and pass count. |
find_build_change_order_checklist_quick_wins |
Find low-effort fixes from small gaps, missing data, expiry and duplicates. |
map_build_change_order_checklist_dependencies |
Map dependency groups and show which ones are missing. |
test_build_change_order_checklist_edge_cases |
Test empty, single-item, duplicate-id, zero-cost, expiry and unknown-category cases. |
summarize_build_change_order_checklist_findings |
Summarize counts, top gaps, top risks and data issues. |
prioritize_build_change_order_checklist_fixes |
Rank fixes by impact divided by effort. |
validate_build_change_order_checklist_inputs |
Validate arbitrary JSON and report schema errors and warnings. |
detect_build_change_order_checklist_duplicates |
Group items with the same category and normalized name. |
measure_build_change_order_checklist_variance |
Measure metric spread, category variance and tag diversity. |
benchmark_build_change_order_checklist_options |
Benchmark lean, balanced and full sizes against readiness and data targets. |
explain_build_change_order_checklist_tradeoffs |
Explain size, cost, freshness and data-quality tradeoffs. |
draft_build_change_order_checklist_checklist |
Draft a checklist from gaps, high risks, missing data and budget. |
export_build_change_order_checklist_audit |
Export the full audit with metrics, gaps, risks, constraints and next steps. |
track_build_change_order_checklist_changes |
Compare two snapshots by item id and list added, removed and changed items. |
review_build_change_order_checklist_history |
Review dated snapshots and show readiness, cost and metric trends. |
score_build_change_order_checklist_confidence |
Score trust from data completeness, item count and field coverage. |
recommend_build_change_order_checklist_next_steps |
Recommend the next five actions with quick wins. |
open_build_change_order_checklist_questions |
List open questions that block a better audit. |
Rules
- Local computation only. No network calls, no telemetry, no paywall.
- Missing dates, costs and quantities are reported, not invented.
- Dates use
YYYY-MM-DD.
- MIT licence.