Scan your whole stack
Latest version: vgit:14edb65f640876a0714252bca6e9f6f546307153
test-effort-estimation was last scanned on 13 Nov 2026 at commit 14edb65f. Risk score 1 of 100 (low). No malicious behavior was detected.
| Version | Published | Status |
|---|---|---|
| 14edb65f | 1 rule fired |
Findings for commit 14edb65f. The score is a capped sum of the weights of the rules that fired — not CVSS, not exploitability, and not a probability. It is not comparable across packages with different scan coverage.
The skill's text or scripts mention a tunneling service such as ngrok or trycloudflare, a Discord webhook, a raw paste link or a public IP address. Legitimate tools reference these too, so this is context for review rather than evidence of harm.
LOWThe score describes 14edb65f; other versions have their own rules, not their own score.
The publisher’s own README, as collected from the registry.
A test effort estimate is a probability distribution over hours. Reporting it as one number destroys the only information that makes it useful: how wide the distribution is, and what has to stay true for it to hold.
This skill produces three things per epic:
This skill owns hours and ownership. The taxonomy of change shapes, the
path and content signals used to detect them, and the relative per-layer cost
model live in
references/change-shape-classifier.md,
and the estimating steps consume that classifier's output: a distribution
over pure-logic, service-layer, ui-heavy, and data-heavy, each already
mapped to the test layer where its verification lands. Do not re-derive that
mapping inside the estimate. If the shape definitions get copied into the
estimator's own tables, the two answers drift and stop agreeing.
It also stops short of two downstream decisions. It does not select which existing tests to run for a given change, and it does not set coverage depth (how many tests of what type, with what entry and exit criteria). Both consume this estimate; neither is produced by it.
Read the boundary as: shape in, hours and owners out.
Split the epic into discrete testable areas. Each area maps to one or more acceptance criteria and to a coherent chunk of behaviour a person can be assigned and tracked against. Record for each:
Then assign a risk weight on a coarse 1 to 3 scale:
| Weight | Meaning |
|---|---|
| 1 | Internal only, easily rolled back, small blast radius |
| 2 | Customer facing, recoverable if broken |
| 3 | Payment, authentication, data integrity, or compliance |
Risk weight shifts effort upward: a risk-3 service area gets more test work than a risk-1 service area of the same size. The 1 to 3 scale is a practitioner convention used here as an effort modifier, not a standard risk-scoring method. It is deliberately too coarse to serve as a formal risk assessment. If the programme needs one, run a structured risk-scoring method separately and feed its output in as the weight.
An area with no risk weight is not estimable. Force at least one risk-1 and one risk-3 assignment per epic, or the scale collapses to "medium for everything" and stops carrying signal.
For each (area, layer) pair, produce three values in hours:
| Symbol | Meaning |
|---|---|
a |
Optimistic: everything goes smoothly, no environment or data problems |
m |
Most likely |
b |
Pessimistic: blockers, missing test data, flaky infrastructure |
These are the standard three-point inputs: a is "the best-case estimate", m
is "the most likely estimate", b is "the worst-case estimate"
(Wikipedia, Three-point estimation).
When several people could estimate the area, run a Wideband Delphi round rather than averaging opinions in a meeting (Wikipedia, Wideband delphi). Boehm's sequence, adapted to test effort:
a, m, b anonymously.The anonymity in steps 3 and 6 is the mechanism, not a formality: it stops the loudest or most senior estimate from anchoring the rest. Every disagreement that surfaces in step 5 is a candidate assumption for Step 4's ledger, because two people estimating the same area differently are usually assuming different things about scope, environment, or data.
Combine the three points with the PERT formulas:
E = (a + 4m + b) / 6
SD = (b - a) / 6
These are the classical PERT definitions, valid on the assumption that a PERT
distribution governs the data (Wikipedia, Three-point estimation; Brunel University). The 1/6:4/6:1/6 weighting "is essentially
fixed and cannot be altered" (Brunel); to weight the pessimistic case more
heavily, raise b, do not rewrite the formula.
Report every row as a range, E - SD to E + SD. Never collapse a row to a
point. The three estimates define a distribution in which "all times are
possible (with an associated probability)" (Brunel); a single number discards that.
Expected values add directly: the epic total E is the sum of the row E
values.
Spreads do not. Sum the variances (SD squared) and take the square root of
the total, which is how PERT combines activity spreads along a path
(Brunel University, Network analysis: uncertain completion times):
E_total = sum(E_i)
SD_total = sqrt( sum(SD_i^2) )
That aggregation assumes the rows are independent. The cited PERT treatment
makes the same independence assumption explicitly and warns that when it does
not hold "the probability figures calculated may be inaccurate"
(Brunel University, Network analysis: uncertain completion times).
Test rows are frequently not independent: one missing staging environment
blows out every row at once. When rows share a dependency, also report the
fully-correlated bound, sum(SD_i), as a worst case, and name the shared
dependency in the ledger.
An estimate without a ledger is not an estimate. It is a guess with a decimal point. The ledger is what makes the number auditable: it is the only artifact that lets someone later ask "which assumption failed?" instead of "who was wrong?".
This is not a local house rule. Federal cost-estimating guidance makes documentation one of the four pillars of a reliable estimate: a well-documented estimate identifies "rationales, assumptions, original source data, and methodologies used for calculations" (IRS IRM 1.33.9.3).
Every row in the effort table cites at least one assumption ID. Six categories are mandatory: an epic-level ledger that is missing any of them is incomplete, and the missing category is usually where the estimate later breaks.
| # | Category | What it pins down | Example entry |
|---|---|---|---|
| 1 | Scope boundary | What is explicitly excluded | "Stories 12 to 15 only. Story 16 (dark mode) is excluded." |
| 2 | Environment | What must exist, and when | "Staging environment available from sprint day 2." |
| 3 | Test data | What data exists and who produces it | "Fixture generator covers all discount-code scenarios." |
| 4 | Dependency | Interfaces and teams outside the estimate | "Auth service API is stable; no interface churn expected." |
| 5 | Skill | Who is available and what they can already do | "One automation engineer with browser-automation experience on the team." |
| 6 | Risk rating | Why each risk weight was assigned | "Checkout rated risk-3 because it processes real payments." |
Two rules make the ledger load-bearing:
E into a date, they have made a commitment the
estimate does not support.Each (area, layer) row gets an owner. The default split below is a practitioner convention for a conventional team structure, not a standard; it is grounded in where the work naturally sits, not in a cited allocation rule.
| Layer | Default owner | Why |
|---|---|---|
| Unit | The developer writing the production code | Tests land in the same PR as the code; unit tests run fast, keeping the loop inside the edit cycle |
| Service | Automation engineer | API and integration tests need harness and environment work and run slower than stubbed unit tests |
| UI / E2E | Automation engineer, or a manual tester for the long tail | Automate happy paths only; end-to-end UI tests are brittle, expensive to write, and slow to run |
| Exploratory | Manual tester | A manual approach for the tester's freedom to spot issues a scripted row cannot cover |
Layer characteristics per Fowler and Vocke, The Practical Test Pyramid and Fowler, TestPyramid.
Three allocation rules:
data-heavy areas get a dedicated data-checking row in addition to their
service row: schema and contract changes fail in ways a request-level test
does not see.Ownership is a recommendation. If capacity figures were supplied, compare each
role's summed E against its available sprint hours and flag every role whose
estimate exceeds capacity, with a suggested redistribution. If the split implies
a large shift in the balance between layers (for example, an epic that adds 40
percent more UI-layer test work), say so explicitly so someone can review the
overall test mix before the work starts.
The full row-by-row PERT arithmetic for the "Promo codes at checkout" epic - six (area, layer) rows, the variance-sum aggregation, and the independent vs fully-correlated ranges - is in references/worked-example.md.
Emit one Markdown document with these sections, in order:
a/m/b, E, range, owner, assumption IDs.Keep the "distribution, not a commitment" line and the Method section even when
they feel redundant; they are what stop a reader from turning E into a date.
The full filled template is in
references/effort-estimate-output-template.md.
Find threats in your stack.
OX Radar can check high-priority threats, like critical package CVEs, against your context.
Each incident is marked Detected or Not Detected with a remediation plan and proof all tracked in the Response Center.
The probe returned only these fields for this server — auth requirement, protocol and tool list weren’t observed, so they’re not shown (never guessed).
The publisher’s own links, as the registry reports them. These are not sources for the assessment on this page.