Introducing The Sweep: OX’s New Live Security Research Series
Register Now
Breaking: The 2026 Vulnpocalypse Hits PHP: Four Critical RCEs, but How Dangerous Are They?
Read the Report
Are you exposed? Connect your apps in minutes.
Scan your apps free

action-priority-ap

Latest version: vgit:55086d81de5b3f34a550ea67339b36d4c1dc58d6

Overview

Last scanned
19 Nov 2026
Agent skill Source: GitHub
1 Versions

Scan summary

action-priority-ap was last scanned on 19 Nov 2026 at commit 55086d81. Risk score 1 of 100 (low). No malicious behavior was detected.

  • Releases: Single version.
  • Findings: 1 rule fired in commit 55086d81 (1 low). The score describes this commit only.

Versions

1 version published
Versions and the rules that fired in each
VersionPublishedStatus
55086d81 1 rule fired

Rules fired in 55086d81: 1

Findings

1 Low

Findings for commit 55086d81. The score is a capped sum of the weights of the rules that fired — not CVSS, not exploitability, and not a probability. It is not comparable across packages with different scan coverage.

Skill mentions tunnel, paste or webhook services

The skill's text or scripts mention a tunneling service such as ngrok or trycloudflare, a Discord webhook, a raw paste link or a public IP address. Legitimate tools reference these too, so this is context for review rather than evidence of harm.

LOW
Checking access…

🔒 Create a free account to see all 1 finding with descriptions and instance counts

The score describes 55086d81; other versions have their own rules, not their own score.

README

The publisher’s own README, as collected from the registry.

Action Priority (AP) — AIAG-VDA 2019

Goal

Assign and audit Action Priority (AP) ratings correctly using the AIAG-VDA 2019 method, ensuring high-risk items receive justified action or formal risk acceptance. This skill is used when classifying risk levels in PFMEA or DFMEA, reviewing existing ratings, or auditing FMEA documents for AP compliance.


Required AP Review Checklist

☐ Confirm the linked Failure Effect, Failure Mode, and Failure Cause are correct before assigning AP ☐ Confirm S is based on the Failure Effect (severity to the customer or end user) ☐ Confirm O is based on the Failure Cause with current prevention controls in place ☐ Confirm D is based on current detection controls for this Failure Mode ☐ All S, O, and D ratings are supported by data, field history, capability data, or documented engineering judgement — not guesses ☐ Assign AP using the full AP determination rules (see ap-table.md) — not only the summary patterns in this skill ☐ For formal PPAP submissions, customer-facing FMEAs, or any disputed rating, confirm against your licensed AIAG-VDA FMEA Handbook — the rating criteria that make an S, O or D value defensible are in the handbook, not in this skill ☐ For every H-AP item: define a corrective action with owner and target date, or document a formal escalation rationale ☐ Reassess AP only after the corrective action is implemented and verified — not when only planned ☐ Verify Special Characteristics are rated S = 9 or 10 ☐ Document the evaluation decision for every M-AP item (action taken or rationale for no action) ☐ Document rationale for every L-AP item


Why AP replaces RPN

The legacy RPN = Severity × Occurrence × Detection had critical flaws:

Problem 1 — Same RPN, very different risk

  • S=6, O=6, D=6 → RPN = 216
  • S=9, O=8, D=3 → RPN = 216 The second scenario involves a safety-related severity (S=9) and high occurrence — far more dangerous — yet produces the same RPN.

Problem 2 — Easy to game Teams learned to lower RPN cheaply by improving detection (adding an inspection step). D: 8→3 drops RPN by 62.5%. But the defect is still being made — it's just being caught later. Prevention (reducing occurrence) is harder but far more valuable.

Problem 3 — No mandatory threshold RPN had no defined threshold for mandatory action. "High RPN" meant different things to different teams and customers.

The AP fix:

  • S=9 or S=10 → always H (mandatory action), regardless of O and D
  • AP looks at S and O together first (risk of harm occurring), then considers D
  • Requires documented action or documented rationale for no action

AP Classification

H — High Priority

Action required. Assign a responsible person and a target completion date.

If no improvement is achievable (technically or economically), the team must:

  1. Document why no action is possible
  2. Escalate to management for acceptance of residual risk
  3. Get management sign-off

H-AP items must never be silently ignored.

Conditions that always produce H:

  • S = 9 or 10 (any O, any D)
  • S = 8 + O = 6–10 + D = 6–10
M — Medium Priority

Action recommended. The team should evaluate whether risk reduction is beneficial.

M-AP does not mean "no action needed." It means action is not mandatory, but the team must document its evaluation decision:

  • Action taken → describe the action
  • No action → document why (risk accepted, cost-prohibitive, technically infeasible)
L — Low Priority

No action required. Document rationale for the record.


AP Assessment Workflow

This skill explains AP logic and decision patterns. Use the full AP determination rules (ap-table.md) for final rating assignment. Do not rely solely on the summary patterns below for disputed cases or formal PPAP submissions — those require the rating criteria in your licensed AIAG-VDA FMEA Handbook.

Before assigning AP: Do not assign AP unless S, O, and D are already justified based on the linked failure effect, failure cause, and current controls. AP is only as good as the ratings it is built on.

For each FC (Failure Cause) row in the PFMEA/DFMEA:

1. Assign S (for the linked Failure Effect)
2. Is S = 9 or 10?
   → Yes: AP = H. Done.
   → No: continue

3. Assign O (for this Failure Cause with current prevention controls)
4. Assign D (for this Failure Mode with current detection controls)
5. Look up AP in the full table (see ../pfmea-process/assets/ap-table.md)

All S, O, and D ratings must be supported by test data, field history, capability data, or documented engineering judgement.


Action priority by S bracket

The patterns below are practical summaries for working use. Final AP assignment must always be confirmed against the full AIAG-VDA AP table. For disputed cases or audits, the full table takes precedence.

S = 9–10 (Safety / Regulatory)
O D AP
Any Any H
S = 8 (Loss of primary function)
O D AP
6–10 Any H
4–5 6–10 H
4–5 1–5 M
1–3 Any M
S = 7 (Reduced primary function)
O D AP
6–10 7–10 H
6–10 4–6 M
6–10 1–3 M
4–5 7–10 M
4–5 4–6 M
4–5 1–3 L
1–3 Any L
S = 6 (Loss of comfort/convenience)
O D AP
8–10 7–10 H
8–10 4–6 M
8–10 1–3 M
5–7 7–10 M
5–7 1–6 L
1–4 Any L
S = 1–5

All combinations → L


Revised AP — Governance Rule

Do not lower AP based on planned actions. Revised AP may only be assigned after the corrective action is implemented and the implementation is verified with objective evidence. A planned action is not a completed action.


Reviewing an existing FMEA for AP compliance

Audit questions:

  1. Are all S=9/10 rows assigned AP=H?
  2. Do all H-AP rows have an assigned owner AND target date?
  3. Are there any H-AP rows with no action and no documented escalation rationale?
  4. For rows where AP was improved (revised AP column): is the action implemented and verified — not just planned?
  5. Are Special Characteristics all rated S=9 or S=10?
  6. Are S, O, and D justified with data or engineering rationale, or were they guessed?

Customer-specific notes

OEM AP requirement
Ford H-AP items require mandatory action or documented engineering justification (EJ)
GM BIQS requires all H-AP items closed before PPAP Level 3
VW/Audi AP H must be actioned or formally accepted by responsible engineer
BMW AP H items listed on open issues list until closed
Stellantis H-AP items require SQE approval for acceptance without action

Customer-Specific Requirements (CSR) are revision-controlled and may change. Always verify the latest customer requirement before release, PPAP, or customer submission. See oem-requirements.md for OEM-specific detail.

Output Format

At the start of each use, ask the user:

"How would you like to receive the output? A — Structured Markdown (formatted tables and sections, ready to copy) B — Plain tables (simplified structure for Excel or Word) C — Narrative report (flowing text for a formal document or email)

Default: A."

Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.

Changelog

Version Date Author Change
1.0 2026-06-01 @RBraga01 Initial release
1.1 2026-06-03 @migmcc Polished AP classification logic, added OEM CSR requirements table

OX Radar and Response Center

Find threats in your stack.

OX Radar can check high-priority threats, like critical package CVEs, against your context.

Each incident is marked Detected or Not Detected with a remediation plan and proof all tracked in the Response Center.

Where it’s listed

The probe returned only these fields for this server — auth requirement, protocol and tool list weren’t observed, so they’re not shown (never guessed).

  • GitHub tigerlovefbro/codex-plugins/action-priority-ap

References

The publisher’s own links, as the registry reports them. These are not sources for the assessment on this page.

Scan your whole stack

Group 1261154050 1
Group 1261154050
 

From OX Research Newsroom

Critical Apache HTTP Server Flaw Exposes Web Servers to RCE (1)
CVE

CVE-2026-119618: Critical Apache HTTP Server Flaw Exposes Web Servers to Remote Code Execution

Copy of Template Design OX Blog (1)
Research

Thousands Of GitHub Accounts Hijacked With wfx-loot CI Secret Stealing Malware Via GitHub Actions & npm

CVE

Java4Shell (CVE-2026-114938): Easy to Crash, Hard to Exploit — Less Than 0.12% of JVMs Estimated at Risk of RCE

Frame 2085668439 (1)
Group 1261154229