Introducing The Sweep: OX’s New Live Security Research Series
Register Now
Breaking: The 2026 Vulnpocalypse Hits PHP: Four Critical RCEs, but How Dangerous Are They?
Read the Report
Are you exposed? Connect your apps in minutes.
Scan your apps free

dvp-test-plan

Latest version: vgit:51faf411be2de4a3bc599c845672889935ce4749

Overview

Last scanned
19 Nov 2026
Agent skill Source: GitHub
1 Versions

Scan summary

dvp-test-plan was last scanned on 19 Nov 2026 at commit 51faf411. Risk score 1 of 100 (low). No malicious behavior was detected.

  • Releases: Single version.
  • Findings: 1 rule fired in commit 51faf411 (2 instances: 2 low). The score describes this commit only.

Versions

1 version published
Versions and the rules that fired in each
VersionPublishedStatus
51faf411 1 rule fired

Rules fired in 51faf411: 1

Findings

2 Low

Findings for commit 51faf411. The score is a capped sum of the weights of the rules that fired — not CVSS, not exploitability, and not a probability. It is not comparable across packages with different scan coverage.

Skill mentions tunnel, paste or webhook services

The skill's text or scripts mention a tunneling service such as ngrok or trycloudflare, a Discord webhook, a raw paste link or a public IP address. Legitimate tools reference these too, so this is context for review rather than evidence of harm.

LOW
Checking access…

🔒 Create a free account to see all 2 findings with descriptions and instance counts

The score describes 51faf411; other versions have their own rules, not their own score.

README

The publisher’s own README, as collected from the registry.

Design Verification Plan and Report (DVP&R)

When to use

Use this skill when:

  • Creating a DVP for a new part design during APQP Phase 2
  • Reviewing a supplier's DVP for completeness and DFMEA alignment
  • Determining which tests are required for a specific failure mode or design characteristic
  • Tracking test completion and recording results (the "R" in DVP&R)
  • Assessing whether a design change requires additional validation testing

Prerequisites

  • DFMEA with all failure modes identified and AP ratings assigned
  • Engineering drawing with all characteristics defined
  • Customer design specifications and performance requirements
  • List of applicable standards and test methods (customer spec, ISO, SAE, etc.)

Workflow

Step 1 — Understand the DVP structure

The DVP&R is a table with one row per test. Each test must address at least one failure mode or design characteristic from the DFMEA.

The linkage rule: Every H-AP (High Action Priority) failure mode in the DFMEA must have at least one corresponding test in the DVP. If a failure mode has no test, document why (e.g., analysis-only justification with sign-off).

Step 2 — Build each DVP row
Column What to enter
Test number Sequential reference (e.g., DVP-001)
DFMEA reference Failure mode number(s) this test addresses
Test name / description Specific name of the test (not "durability test" — use "salt spray 240h per ASTM B117")
Test specification Standard or specification number with version (e.g., ASTM B117-19, SAE J2530, customer spec DS-XYZ)
Pass/fail criteria Exact acceptance criteria (e.g., "no rust after 240h", "burst pressure > 150 bar", "dimension within ±0.05 mm")
Sample size Number of parts to test
Who performs Internal lab, external accredited lab, customer lab
Phase P = Prototype, PL = Pre-launch, PR = Production
Planned date Date test is scheduled to complete
Actual date Date test was completed
Result Pass / Fail / In progress
Report reference Lab report number or document reference
Comments Failures, deviations, re-test requirements
Step 3 — Determine required tests

For each DFMEA failure mode, identify the test category:

Functional / performance tests:

  • Tests that verify the product performs its intended function
  • Examples: burst pressure, tensile strength, electrical resistance, flow rate
  • Must demonstrate the product meets its design intent specifications

Environmental / durability tests:

  • Tests that simulate the product's operating environment over its design life
  • Examples: thermal cycling, salt spray, vibration, UV exposure, humidity
  • Duration and cycles must represent the design life or accelerated equivalent

Safety / regulatory tests:

  • Tests required by law, regulation, or homologation
  • Examples: ECE R10 (EMC), FMVSS standards, ECE R94/R95 (crash), REACH, RoHS
  • Must be performed by accredited lab; results must accompany PPAP

Dimensional / material tests:

  • Verification that design dimensions and material properties are achieved
  • Examples: 3D scan, CMM, tensile test, hardness test, chemical composition
  • Must reference the specific drawing characteristic or material specification

Reliability / life tests:

  • Tests that verify the product meets its reliability target (e.g., B10 life)
  • Examples: fatigue testing, accelerated aging, wear testing
  • Test plan must include correlation between accelerated test and field life
Step 4 — Populate timing per APQP phase
Phase Tests due
Prototype (P) Tests on design concept — functional, dimensional, preliminary environmental
Pre-launch (PL) Tests on tooled parts — full environmental, durability, all safety/regulatory
Production (PR) Confirmation tests on production parts — dimensional, safety, any tests with production-specific requirements

Not all tests need to run in all phases. Focus safety and regulatory tests on Pre-launch or Production parts.

Step 5 — Track completion (the "R" in DVP&R)

Update the DVP after each test:

  • Record actual completion date
  • Record Pass/Fail result
  • For any Fail: log a DFMEA action (or open an 8D if failure escapes to customer)
  • Re-test after corrective action — reference the re-test as a new row with the original DVP number + suffix (e.g., DVP-012-R1)

At PPAP submission: all DVP tests must show "Pass" or have a documented customer-approved deviation. If a test is still in progress at PPAP submission (e.g., a long-duration life test), a formal customer deviation request must be submitted with: the test in progress, the expected completion date, the interim risk assessment, and the customer's written acceptance. The PPAP approval will be conditional until the test completes with a Pass result.

Engineering changes: If the DFMEA is updated during the design phase and adds new H-AP failure modes, the DVP must be updated to cover them before the next gate review. A DVP revision that is behind the current DFMEA revision is a gap — the DVP&R revision must match or exceed the DFMEA revision at PPAP submission.

Step 6 — Audit an existing DVP

When reviewing a supplier's or internal DVP, check:

  • [ ] Every H-AP DFMEA failure mode has at least one corresponding test
  • [ ] Test specifications reference a specific standard or document (not "internal test")
  • [ ] Pass/fail criteria are objective and measurable (not "acceptable appearance")
  • [ ] Sample sizes are adequate (not "1 sample" for durability/life tests)
  • [ ] Safety and regulatory tests are assigned to an accredited external lab
  • [ ] All results show "Pass" (or documented deviations with customer approval)
  • [ ] Failed tests have a corresponding DFMEA update or corrective action reference
  • [ ] DVP revision is aligned with the current DFMEA revision

Validation criteria

A complete DVP&R for PPAP submission must:

  • Reference every H-AP failure mode from the DFMEA
  • Have specific, standard-referenced test methods (not "per engineering judgement")
  • Show Pass results for all tests (or customer-approved deviations)
  • Have accredited lab reports for all safety/regulatory tests
  • Be signed off by design engineering and quality

Common mistakes

  • DVP created with generic tests not linked to specific DFMEA failure modes
  • Pass/fail criteria defined as "meets spec" without stating what the spec is
  • All tests assigned to internal lab when regulatory tests require external accreditation
  • DVP not updated when DFMEA adds new H-AP failure modes during design reviews
  • Re-tests after failures not documented — original Fail result erased
  • Sample size of 1 for durability or life tests (statistically meaningless)
  • DVP not updated to "Report" status at PPAP — submitted as plan, not results

Output Format

At the start of each use, ask the user:

"How would you like to receive the output? A — Structured Markdown (formatted tables and sections, ready to copy) B — Plain tables (simplified structure for Excel or Word) C — Narrative report (flowing text for a formal document or email)

Default: A."

Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.

Changelog

Version Date Author Change
1.0 2026-06-06 @RBraga01 Initial release
1.1 2026-06-06 @migmcc Added guidance for tests in-progress at PPAP submission (customer deviation process); added DVP revision synchronisation with DFMEA requirement

OX Radar and Response Center

Find threats in your stack.

OX Radar can check high-priority threats, like critical package CVEs, against your context.

Each incident is marked Detected or Not Detected with a remediation plan and proof all tracked in the Response Center.

Where it’s listed

The probe returned only these fields for this server — auth requirement, protocol and tool list weren’t observed, so they’re not shown (never guessed).

  • GitHub tigerlovefbro/codex-plugins/dvp-test-plan

References

The publisher’s own links, as the registry reports them. These are not sources for the assessment on this page.

Scan your whole stack

Group 1261154050 1
Group 1261154050
 

From OX Research Newsroom

Cry2Wolf: How to Tell a Real Bug from a Nothingburger
AI & VibeSec

Cry2Wolf: Not Every Branded Bug Deserves a Fire Drill

CVE

Java4Shell (CVE-2026-114938): Easy to Crash, Hard to Exploit — Less Than 0.12% of JVMs Estimated at Risk of RCE

Vulnerability Insights

OpenSSH Password Authentication Bypass on Alpine Linux (*sshole) – CVE-2026-123158

Frame 2085668439 (1)
Group 1261154229